Project Manager (PMC, Refinery) job in Korea
Our client intends to build own and operate a hydrocracking complex in Egypt. This new hydrocarbon processing facility will derive feeds from an existing adjacent refinery complex. New process units will include a vacuum distillation unit high severity hydrocracker delayed coker diesel hydrotreater naphtha hydrotreater low pressure naphtha reformer amine treating units and sulphur recovery units.
The hydrocracking complex will be designed built and operated to the highest international environmental and health and safety standards.
WorleyParsons scope is for the provision of Project Management Consultancy PMC services for the FEED EPC contractor selection and EPC phases of the project.
We are currently sourcing Project Manager PMC with a minimum of 10-15 years experience in Senior Project Management Level and Refinery Projects. Must have a B.S. or equivalent degree in Engineering preferably from a Process or Mechanical engineering and design background. Preferably have Middle East experience. Experience of managing multidisciplinary teams within a multicultural environment. Must have well developed engineering planning skills.
Preference would be given to those with a minimum of 7 years experience with an international Engineering Consultancy Firm.
Location & Contract Duration:
The assignment on the refinery project would be for 3-4 years. Initial work location is Seoul during the detailed design and procurement phase of the project. Once construction starts personnel will be required to relocate to the refinery jobsite in Cairo .
To apply now please visit <web address removed> Search our career section enter the Job code: EGT- <phone number removed> register with a copy of your resume and then click apply online.

