Completions and Well Site Engineer job in Kazakhstan

Rate
Type
Contract
Location
Kazakhstan
Region
Town
Required Residency
Posted By
Link Oil & Gas Professionals
Date Posted
03 Mar 2010
Expiry Date
Job Reference
Job Description

ONLY CANDIDATES WITH EXPERIENCE WORKING FOR A MAJOR OIL AND GAS OPERATOR WILL BE CONTACTED.

A major Oil and Gas company is Seeking A Completions and Well Site Engineer to be based in Aktau to start immediately. The closing date for this position is 19 March 2010.

Job Description

GENERAL

Procedures

· Review procedures and provide feedback to Engineering

Risk Assessment

· Review risk assessments and ensure mitigators / action items are in place / addressed

Reporting Line

· The Well test Engineer will report to the ExxonMobil Completions Engineer or (during offshore operations) the Rig Supervisor

PRE-JOB (based in Aktau)

· Directly supervise service companies in preparation and execution of completions and/or well test activities.

· Ensure all equipment is available when needed and is fit-for-purpose.

· Ensure all personnel are available when needed.

· Review all procedures with service company personnel before start of job.

· Review and confirm with all respective contractor supervisors the operating parameters of all equipment.

· Act as a liaison between the Drilling and all service companies.

ON-SITE (based on rig)

Mechanical Completion

· Installation of mechanical completion

- Ensure all required equipment on-board

- Assist preparation of tubing tally and space out calculations

- Witness / verify positive and inflow testing of 7 top of liner

- Ensure wellbore cleanliness and submit graphical presentation of NTU vs circulation

- Witness proper make-up and pick-up of production packer assembly.

- Ensure proper setting of production packer.

- Witness proper TR-SCSSV make-up and pick-up

- Witness proper tubing hanger and landing joint make-up

- Witness / verify tubing hanger landing

- Witness / verify tubing test

- Witness / verify TR-SCSSV inflow test

- Ensure proper control line termination

- Inspect tubing hanger neck

- Prepare wellbore schematic

· Remedial operations such as plug backs, squeezes, etc.

Cased Hole Logging

· Rig-up / rig-down and safe operating procedures

· Confirm toolstring configuration

Perforating

· Execution of perforation job; log correlation, confirmation of shots fired, etc.

- Ensure base log is correlated against cased hole correlation log

- Ensure guns loaded in proper order

- Ensure sufficient inventory of guns and charges

- Verify e-line tool string and BHA including back-up

- Ensure proper hook-up of control panel to shear ram / wireline rams / grease injector / grease nipple on BOP

- Ensure proper pressure testing

- Verify grease inventory

- Verify gun correlation

Clean-up

· Rig-up, pressure test / integrity and supervision

- Ensure proper rig-up; no leaks on surface lines

- Ensure clean-up criteria is met

Stimulation

· Rig-up / rig-down and mechanical integrity of stim pumps, CTU, lines, etc.

- Witness proper rig-up / testing of stimulation lines

- Verify proper integrity of surface lines after rigging down stimulation lines

- Ensure proper operation of stimulation equipment (pump availability, metering accuracy, etc)

- Adhere to pressure limits specified in the procedure. Get approval for any changes to pressure limits from the Completion Engineer.

- Annular pressure limits will not be changed without a comprehensive review with the Completions Engineer.

· Running or application of mechanical isolation

- Ensure required plug, toolstring, BHA and wireline unit readiness

- Review on-site procedure

- Witness / verify rig-up and pressure testing

- Witness / verify plug setting and unlatching of running tool

Well Testing and DSTs

· Rig-up / rig-down and mechanical integrity of well test equipment, lines, etc.

- Ensure well test equipment rigged-up per P&ID

- Agree final DST tool string configuration (rupture disc settings, IRDV programming, etc)

- Verify separator functions

- DST Daily Activity report

- Confirm all wireline tool string configurations for adequate weight to get in the hole and prevent birdnesting.

Reporting

· Start preparing and collecting information required for the Completions Final Well Report

- Completion Time Analysis

- Obtain required service company reports

POST JOB REPORT AND ANALYSIS

Reporting

· Prepare initial Well Handover documentation for Operations

· Prepare Completions Final Well Report

- Completion and Test Summary

- Completion Procedures

- Mechanical Equipment Installation

- Perforating, Clean Up, Stimulating & Testing

- Completion Time, Cost Summary, Major NPT Summary

- Operational Problems & Recommendations

- Detailed Daily Completion Reports

- 7 Liner

- 9-5/8 / 7 Packers & Tieback Equipment

- TR-SCSSV

- Wellhead and Christmas Tree

- Torque Turn Plots

- Slickline Reports

- Tubing Tally, Liner Tally, Spaceout Calculations, Deviation Survey

- Cased Hole Log Summary & Cover Sheet

- Perforation Depth Correlation Log Cover Sheet

- Stimulation Report

- Daily Testing Reports

- Perforation Reports

· Electronic documentation of rig & mechanical operations

- Service / Equipment Deficiency Report

- Daily Flaring Report

- Lessons Learned

- Pictures of rig-ups, operations, layouts, etc. as required

- Time Breakdown Analysis

- Copy of Drillers Instructions

Qualifications
Apprenticeship or equivalent

 

Receive Oil and Gas jobs by email