2775, Well Test Engineer job in Kazakhstan
ONLY CANDIDATES WITH EXPERIENCE WORKING FOR A MAJOR OIL AND GAS OPERATOR WILL BE CONTACTED.
A major Oil and Gas company is Seeking A Completions and Well Site Engineer to be based in Atyrau to start immediately. The closing date for this position is 19 March 2010.
JOB DESCRIPTION
Procedures
· Review procedures and provide feedback to Engineering
Risk Assessment
· Review risk assessments and ensure mitigators/action items are in place/addressed
Reporting Line
· The Well Test Engineer will report to the Company Completions Engineer or (during offshore operations) the Rig Supervisor
PRE-JOB (based in Atyrau)
· Directly supervise service companies in preparation and execution of completions and/or well test activities.
· Ensure all equipment is available when needed and is fit-for-purpose.
· Ensure all personnel are available when needed.
· Review all procedures with service company personnel before start of job.
· Review and confirm with all respective contractor supervisors the operating parameters of all equipment.
· Act as a liaison between the Drilling and all service companies.
ON-SITE (based on rig)
Mechanical Completion
· Installation of mechanical completion
· Ensure all required equipment on-board
· Assist preparation of tubing tally and space out calculations
· Witness/verify positive and inflow testing of 7 top of liner
· Ensure wellbore cleanliness and submit graphical presentation of NTU vs. circulation
· Witness proper make-up and pick-up of production packer assembly.
· Ensure proper setting of production packer.
· Witness proper TR-SCSSV make-up and pick-up
· Witness proper tubing hanger and landing joint make-up
· Witness/verify tubing hanger landing
· Witness/verify tubing test
· Witness/verify TR-SCSSV inflow test
· Ensure proper control line termination
· Inspect tubing hanger neck
· Prepare wellbore schematic
· Remedial operations such as plug backs, squeezes, etc.
Cased Hole Logging
· Rig-up/rig-down and safe operating procedures
· Confirm toolstring configuration
Perforating
· Execution of perforation job; log correlation, confirmation of shots fired, etc.
· Ensure base log is correlated against cased hole correlation log
· Ensure guns loaded in proper order
· Ensure sufficient inventory of guns and charges
· Verify e-line tool string and BHA including back-up
· Ensure proper hook-up of control panel to shear ram/wireline rams/grease injector/grease nipple on BOP
· Ensure proper pressure testing
· Verify grease inventory
· Verify gun correlation
Clean-up
· Rig-up, pressure test/integrity and supervision
· Ensure proper rig-up; no leaks on surface lines
· Ensure clean-up criteria is met
Stimulation
· Rig-up/rig-down and mechanical integrity of stim pumps, CTU, lines, etc.
· Witness proper rig-up/testing of stimulation lines
· Verify proper integrity of surface lines after rigging down stimulation lines
· Ensure proper operation of stimulation equipment (pump availability, metering accuracy, etc)
· Adhere to pressure limits specified in the procedure. Get approval for any changes to pressure limits from the Completion Engineer.
· Annular pressure limits will not be changed without a comprehensive review with the Completions Engineer.
· Running or application of mechanical isolation
· Ensure required plug, toolstring, BHA and wireline unit readiness
· Review on-site procedure
· Witness/verify rig-up and pressure testing
· Witness/verify plug setting and unlatching of running tool
Well Testing and DSTs
· Rig-up/rig-down and mechanical integrity of well test equipment, lines, etc.
· Ensure well test equipment rigged-up per P&ID
· Agree final DST tool string configuration (rupture disc settings, IRDV programming, etc)
· Verify separator functions
· DST Daily Activity report
· Confirm all wireline tool string configurations for adequate weight to get in the hole and prevent birdnesting.
Reporting
· Start preparing and collecting information required for the Completions Final Well Report
· Completion Time Analysis
· Obtain required service company reports
POST JOB REPORT AND ANALYSIS
Reporting
· Prepare initial Well Handover documentation for Operations
· Prepare Completions Final Well Report
· Completion and Test Summary
· Completion Procedures
· Mechanical Equipment Installation
· Perforating, Clean Up, Stimulating & Testing
· Completion Time, Cost Summary, Major NPT Summary
· Operational Problems & Recommendations
· Detailed Daily Completion Reports
· 7 Liner
· 9-5/8 / 7 Packers & Tieback Equipment
· TR-SCSSV
· Wellhead and Christmas Tree
· Torque Turn Plots
· Slickline Reports
· Tubing Tally, Liner Tally, Spaceout Calculations, Deviation Survey
· Cased Hole Log Summary & Cover Sheet
· Perforation Depth Correlation Log Cover Sheet
· Stimulation Report
· Daily Testing Reports
· Perforation Reports
· Electronic documentation of rig & mechanical operations
· Service/Equipment Deficiency Report
· Daily Flaring Report
· Lessons Learned
· Pictures of rig-ups, operations, layouts, etc. as required
· Time Breakdown Analysis
· Copy of Drillers Instructions


